President Tinubu Approves Overhaul of Abuja-Kaduna Road Project with New Concrete Design for Lasting Durability
The President Bola Ahmed Tinubu-led government has announced a major redesign for the remaining 127-kilometer stretch of the Abuja-Kaduna-Zaria-Kano highway, a critical infrastructure project in northern Nigeria that has faced prolonged delays.
The President Bola Ahmed Tinubu-led government has announced a major redesign for the remaining 127-kilometer stretch of the Abuja-Kaduna-Zaria-Kano highway, a critical infrastructure project in northern Nigeria that has faced prolonged delays.
The redesign will implement continuously reinforced concrete pavement (CRCP) instead of asphalt, a shift that aligns with the administration’s “Renewed Hope Agenda,” which aims to strengthen Nigeria’s infrastructure and economic resilience.
The Abuja-Kaduna-Zaria-Kano dual carriageway project, which was originally awarded to Julius Berger Nigeria Plc in December 2017, aimed to refurbish the heavily trafficked highway.
The contract was valued at approximately ₦155.7 billion, divided into three sections, and was expected to be completed in 36 months.
While Section II (Kaduna-Zaria) has been completed and Section III (Zaria-Kano) is partly finished, Section I (Abuja-Kaduna) has remained in a deteriorated condition due to various issues and environmental impacts, frustrating road users and slowing economic activities in the region.
In response, the Tinubu administration has not only re-scoped Section I but also split it into two phases.
The first phase, covering 38 kilometres, has been re-assigned to Dangote Industries Ltd., which has subcontracted the work to Hitech Africa Construction Ltd.
The new design involves a switch to CRCP, a more robust and durable pavement method, aimed at addressing recurring deterioration and ensuring a longer-lasting road structure that aligns with global best practices in high-capacity road construction.
Senator David Umahi, Nigeria’s Minister of Works, says he has been working closely with Julius Berger to renegotiate the terms of the project, pushing the company to resume work under a revised contract now valued at ₦740.8 billion.
Despite the adjustments and offers made by the government to meet budgetary requirements, the project’s progress has been hindered by slow mobilization on the part of the contractor.
To address this, the Ministry issued a seven-day ultimatum for the contractor to accept the revised terms or risk contract termination.
The deadline expired on November 4, 2024, prompting the Ministry to issue a 14-day notice of termination.
Senator Umahi has emphasized that the Ministry is fully prepared to reassign the project if Julius Berger does not commit to the new terms, stressing that the government is prioritizing speed and durability to benefit the Nigerian people.
The Abuja-Kaduna-Zaria-Kano highway is a vital artery for connecting the northern region with the Federal Capital Territory (FCT), and its renovation is expected to enhance travel safety and economic activity.
The redesigned concrete pavement, similar to that used in the Lagos-Calabar Coastal Highway and Apapa-Oworonshoki Expressway, is projected to last between 50 to 100 years, ensuring that the highway serves future generations without frequent costly repairs.
President Tinubu has reportedly expressed his commitment to swiftly resolving the project’s delays.
His administration has focused on reducing the burdens on road users and enhancing infrastructure to stimulate broader economic growth, especially given the road’s role as a transit route for goods and services between key northern cities and Abuja.
Minister Umahi, speaking at various forums, has highlighted the government’s frustration with the project’s prolonged delays and reiterated the administration’s determination to move forward.
He noted that the government is committed to maintaining quality and durability, even if it requires reassigning the contract to ensure the same construction standards seen in other high-profile projects.
He added that the Tinubu administration is focused on delivering a high-quality, long-lasting solution that aligns with the president’s vision of a strengthened national infrastructure.


